Location:
Size:
Cost:
Status:
Client:
Contact:
Comments:
Hazel Park, MI
9000 sq ft
$1,009,300
Completed March 2007
Webb Elementary and Jardon Elementary School
Hazel Park Schools
Fred Nix
23136 Hughes
Hazel Park, MI 48030
Tel: 248.542.3910
The Hazel Park Schools required renovations to several classrooms in two separate sections of their Special Needs School. The required work was to be completed during the regular school’s operation schedule and there was to be no interruptions to the students during construction. Faced with this challenge R.A. Connelly, Inc. has stepped up to the task and the project was completed March 2007. R.A. Connelly, Inc. was retained as the Lump Sum General Contractor for this project.